local case study

United Kingdom

Wathegar 2

Wathegar 2 Windfarm, located in Caithness, North Scotland, was developed and constructed by BayWa r.e. in 2017 and has an installed capacity of 18.45 MW. The wind farm is now part of the Gresham House portfolio and BayWa r.e. continues to manage the site as a technical asset manager.

In this function BayWa r.e. coordinates all third-party activities on the site, ensures the accomplishment with HSE regulations, carries out analysis and reporting and is responsible for a 24/7 monitoring.

18.45 MW of installed capacity

local case study

United Kingdom

Wathegar 2

Wathegar 2 Windfarm, located in Caithness, North Scotland, was developed and constructed by BayWa r.e. in 2017 and has an installed capacity of 18.45 MW. The wind farm is now part of the Gresham House portfolio and BayWa r.e. continues to manage the site as a technical asset manager.

In this function BayWa r.e. coordinates all third-party activities on the site, ensures the accomplishment with HSE regulations, carries out analysis and reporting and is responsible for a 24/7 monitoring.

18.45 MW of installed capacity

Project Location