Wathegar 2 Wind Farm
Project overview
Wathegar 2 Wind Farm, located in Caithness, North Scotland, was developed and constructed by BayWa r.e. in 2017 and has an installed capacity of 18.45 MW. The wind farm is now part of the Gresham House portfolio.
13,500 homes
could be supplied with green energy per year
18.45 MW
of installed capacity
9
wind turbines
Project status
sold